Ordering CNC Parts from China
Ordering CNC parts from China, answered plainly: NDAs, quality control, shipping and Incoterms, lead times — and what to check before you send a drawing.

Ordering machined parts from China is routine for thousands of Western companies, and it still raises the same five questions every time: Will my design stay mine? Will the parts be right? How do they get here, and on what terms? How long does it actually take? And who am I talking to when something needs deciding? We are a Dongguan-based machining supplier working for customers worldwide; this page answers those questions the way we would want them answered — plainly, including the parts that are our responsibility and the parts that are yours.
Your design stays yours
An NDA is signed on request, before drawings change hands — that is a standing policy, not a negotiation. Drawings are used to make your parts and for nothing else: not shown to other customers, not used to market with, not mined for product ideas. Product photographs on this website show parts in generic terms, described by material and type. If your quality or legal team has its own NDA form, send it with the first enquiry and it goes through the same route.
Quality is a process, not a promise
The useful question is not "do you have quality control?" — everyone says yes — but "what happens, in order, between my drawing and the box?" Our answer is written out in the inspection and documentation page: first articles checked against the drawing, with critical dimensions recorded, checks during production, a final inspection before packing, and the documents (first article report, material certificates, certificate of conformance) agreed at quote stage and supplied with the parts. For bulk orders, samples with their inspection report go to you for approval and mass production starts after sign-off. ISO 9001 certification stands behind the system. That structure — not a slogan — is what makes a supplier on another continent behave like one in the next town.
Shipping and terms
Parts travel by air for prototypes and urgent small batches, and by air or sea for production quantities, packed as described in our packing practice — protected surfaces, parts separated, documentation with the shipment. On terms: we ship on EXW and DDP. EXW means your forwarder collects from our door and everything from there — freight, clearance, duty — is arranged on your side; buyers with their own freight contracts often prefer it. DDP means the quoted price is the price at your door: shipping, duty and taxes are handled and included, so the number on the quote is the number you pay. Tariff and duty policy changes frequently, which is exactly why the terms are stated on every quote rather than assumed — under DDP the charges are ours to manage, under EXW they are yours, and there is no third possibility hiding in the paperwork.
Lead times, honestly stated
Small batches in common materials typically run 3–5 days of production; simple parts can ship within 24–48 hours depending on complexity. Exotic materials take longer — tungsten carbide, machined by EDM and grinding, runs 20–30 days, and we say so up front rather than at the deadline. Transit time is on top of production time and depends on the route you choose; the quote states production lead time separately from shipping, so the total is arithmetic you can check, not a single optimistic number.
Communication
One contact, in English, who knows your job: we respond within 8 hours and normally quote within 24 hours of a complete enquiry — the quote guide lists what "complete" means (3D model, 2D drawing with tolerances and threads, material, finish, quantity). Time zones mean most exchanges happen in one round trip per day; complete drawings and decisions stated in writing are what keep that from becoming three.
The sensible way to start
Start with a part that matters but is not your crown jewels: a real drawing, a real tolerance, a finish you can judge. Check the first article report against your own measurement. Then scale. It is the lowest-risk way to start with any new supplier.
Send the first drawing through our contact page, with your NDA if you want one signed first. We respond within 8 hours.
FAQ
Will you sign an NDA? Yes — on request, before drawings change hands. Your own NDA form is welcome; send it with the first enquiry.
How is quality controlled on an overseas order? First articles checked against the drawing, with critical dimensions recorded, in-process checks, final inspection before packing, and documents (FAI report, material certificates, CoC) supplied as agreed at quote stage. Bulk orders add sample approval before mass production.
What shipping terms do you quote on? EXW (your forwarder collects from us and handles freight and clearance) or DDP (delivered to your door with shipping, duty and taxes included in the quoted price). The terms are stated on the quote; we do not quote specific tariff rates separately, as policy changes too often for a written number to stay honest.
How long does an order take, door to door? Production is typically 3–5 days for small batches in common materials (24–48 hours for simple parts; longer for exotic materials, stated up front). Transit depends on the route chosen; the quote separates production time from shipping so you can see the total.
What do you need from me to start? A 3D model (STEP, X_T or IGES), the 2D drawing with tolerances, threads and finish, the material grade, and the quantity — plus your shipping terms and any documentation requirements.



