Rush Orders: What Can Be Expedited
Rush CNC machining: which parts can genuinely ship in 24–48 hours, what cannot be hurried, and how to set up an urgent order so no time is lost.

Yes — rush orders are a normal part of our work. Simple parts can ship in 24–48 hours depending on complexity, and routine small-batch prototypes typically take 3–5 days. But "rush" has real limits: some processes take the time they take, and no expediting fee changes the physics. This article separates what can genuinely be hurried from what cannot, so you can plan around the real bottlenecks instead of discovering them. Inquiries are answered within 8 hours, and if your first message says the order is urgent, it is quoted as one.
What can be expedited
Simple machined parts in common materials. A straightforward milled or turned part in 6061-T6 aluminum, common stainless or brass, with a standard finish — this is the work that ships in 24–48 hours. The material is on the shelf or a day away, the machining is a single setup or two, and the finish is in the normal flow.
Routine prototypes. Small-batch prototypes in the usual materials and finishes typically take 3–5 days, and within that range the schedule can usually be tightened when a build date is fixed. Our article on CNC machining lead times breaks down where those days normally go.
The paperwork. Quotes are usually returned within 24 hours, and on an urgent inquiry we will tell you quickly if the date cannot be met — a fast "no, but here is the earliest date" is worth more than a slow "yes" that slips. First article reports and certificates can be prepared alongside production rather than after it, if you tell us at the order stage that you need them.

What cannot be hurried
Tungsten carbide. Carbide parts are ground and EDM-machined, not milled, and they take around 20–30 days. There is no rush version of this; if a carbide part is on your critical path, it needed ordering a month ago, and we will say so plainly.
Special materials. An unusual alloy, a specific certified batch, a large or odd-sized blank — sourcing time is whatever the material market says it is. Common grades are quick; exotic ones are not, and the quote will separate material lead time from machining time so you can see which is which.
Some finishes and outside processes. Hard anodizing, certain platings and heat treatments run in batches and queues. A finish that is running anyway this week is no obstacle; one that is not can add days that expediting the machining cannot recover. This is the most common reason a "two-day part" takes a week, and it is worth asking about the finish, not just the machining, when the date is tight.
Approval steps. If your process needs a sample approved before the batch runs, that loop takes the time it takes — shipping, your inspection, your reply. We send samples before full production as standard on batch orders; on a rush order, decide in advance who approves and how fast, because that decision is usually the real critical path.
How to set up a rush order so no time is lost
Most rush orders lose their time in the gaps, not on the machines. Four things close the gaps:
- Send everything in the first message. Drawing or 3D model, material, finish, tolerances that matter, quantity. Our guide to getting a fast, accurate CNC quote lists the full set; on a rush order, a missing finish specification costs a day of back-and-forth all by itself.
- Say the date and what drives it. "Needed for a test on Thursday" lets us plan backwards and tell you whether Thursday works. "Urgent" alone does not.
- Freeze the design. A revision mid-rush restarts programming and possibly material. If a change is coming, it is usually faster to make the current version now and the revision next week than to hold the order for it.
- Decide the shipping at order time. Production finishing at 24–48 hours only helps if the courier matches. Confirm the shipping method and address with the order, not after the parts are packed.

What rush does to price
Expediting costs what it costs: machine time rescheduled, setups run out of sequence, sometimes a courier upgrade. The quote will show it plainly rather than bury it. What we will not do is charge a rush fee and deliver at normal speed — if we cannot improve the date, we will tell you before you order, and quote the normal schedule at the normal price. For ongoing prototype work, our low-volume CNC machining article explains how repeat small batches are usually scheduled, which is where most "rush" needs disappear: a supplier who knows your parts and keeps the programs rarely needs to hurry.
Tell us early, even before the drawing is final
The most useful rush habit costs nothing: warn us. If you know a part is coming next week and the date will be tight, a message now lets material be ready when the drawing lands. Send the inquiry via our contact page — mark it urgent, give the date, and attach what you have. We will answer within 8 hours with what is possible, not just what is hoped.
FAQ
How fast can you actually ship a simple part? Simple parts can ship in 24–48 hours depending on complexity — a straightforward part in a common material with a standard finish. Routine small-batch prototypes typically take 3–5 days.
Can you expedite tungsten carbide parts? No. Carbide is worked by grinding and EDM and takes around 20–30 days regardless of urgency. If a supplier promises it much faster, ask how — the process does not compress.
Does a rush order cost more? Usually, yes — rescheduled machine time and faster shipping are real costs, and they are shown on the quote. If we cannot improve on the normal date, we tell you before you order and there is nothing to charge extra for.
What is the most common reason a rush order slips? Missing information at the start — an unspecified finish, an unconfirmed tolerance, an approval loop nobody scheduled. The machining is rarely the slow part. Sending the complete package in the first message is the single best expediting step.
Can you hold capacity for our recurring urgent work? For repeat customers with regular prototype flow, scheduling gets easier the more we know your parts — programs and material are already in place. Talk to us about your pattern of work and we will tell you what we can commit to.